Supreme Court: Solar power generating system supply is not works contract, 70:30 split cannot apply before 1 January 2019 - Sterling and Wilson

Update dated 25 November 2026: Supreme Court of India, M/s Sterling and Wilson Pvt. Ltd. v. Union of India and others, Civil Appeal arising out of SLP (C) No. 23844 of 2025, reported as 2026 INSC 1222 (Reportable). The Court held that supply and installation of a Solar Power Generating (SPG) system on EPC terms during July 2017 to December 2018 was not a works contract and was taxable at 5%. The 70:30 split cannot be forced on pre-1 January 2019 periods, and a demand of about Rs 53.36 crore was quashed.

🗣️ Saral bhasha mein samjhein

  • Sterling and Wilson ne 01.07.2017 se 31.12.2018 tak solar plant EPC contracts par poore value par 5% GST bhara (Sr. No. 234, Notification 1/2017).
  • Thane CGST ne SCN (29.03.2023) aur order (17.01.2025) mein kaha ki 70% par 5% aur 30% par 18% lagega, aur Section 74 + penalty laga di. CGST + SGST + penalty milakar total Rs 53,35,80,964 ki demand bani.
  • Supreme Court: 70:30 wala Explanation (Notification 24/2018) sirf 01.01.2019 se lagta hai. Circular 163/19/2021 mein purane period ke liye "can" likha hai, yani yeh option hai, mandatory nahi.
  • SPG system foundation se alag karke kahin aur use ho sakta hai, isliye movable goods hai, works contract nahi.
  • 70:30 regime 2019 mein aaya, toh usse pehle ke period ke liye fraud ya suppression ka sawal hi nahi uthta. Section 74 ka extended period galat tha.

📲 Sawal hai? WhatsApp karein: 8051331315

Facts

Sterling and Wilson sets up SPG systems on turnkey EPC basis. For 1 July 2017 to 31 December 2018 it paid 5% GST on the full contract value under Serial No. 234 of Schedule I to Notification No. 1/2017-Central Tax (Rate). On the basis of a show cause notice dated 29 March 2023, the Joint Commissioner, CGST Thane, passed an order on 17 January 2025 treating the supply as a works contract. He applied a 70:30 split (5% goods, 18% services), invoked Section 74 and imposed penalty under Section 122(2)(b); a summary order followed on 24 January 2025. The CGST demand was Rs 13,33,95,241 plus equal penalty, with a matching SGST amount, so the total exposure was Rs 53,35,80,964. The Bombay High Court dismissed the writ on 28 July 2025 because an appeal remedy was available.

Issue

(i) Was the writ wrongly dismissed for alternate remedy? (ii) Is the supply and installation of an SPG system a works contract under Section 2(119) or a composite supply taxable at 5%? (iii) Could the 70:30 deemed valuation, effective from 1 January 2019, be applied to earlier periods on the strength of Circular No. 163/19/2021-GST?

Arguments

The Revenue argued that the SPG system is immovable because it is permanently installed with civil works, and that the Circular required the 70:30 ratio for the pre-2019 period. The appellant relied on the unchallenged Andhra Pradesh High Court ruling in its own case dated 10 January 2025.

Held / Ruling

Alternate remedy is not a straitjacket rule; the cursory dismissal was unjustified, and the Court decided the merits itself. Notification Nos. 24/2018 and 27/2018 (the 70:30 Explanation and Serial No. 38) came into force only on 1 January 2019 and are not retrospective. Circular 163/19/2021-GST only gave taxpayers an option to adopt 70:30 for earlier periods; it did not make the ratio mandatory. With no mandatory regime in place, there could be no fraud or suppression, so invoking Section 74 failed, citing Tata Steel. The panels can be detached from the foundation and used elsewhere; the foundation only keeps the system stable. Following Bharti Airtel and the Andhra Pradesh High Court decisions (including Siemens Gamesa), an SPG system is not immovable property, and not every composite supply is a works contract. The later Serial No. 201A wording (Notification 8/2021) cannot apply retrospectively. The appeal was allowed and both orders were set aside.

Key takeaways for taxpayers

  • For July 2017 to December 2018, solar EPC suppliers who paid 5% on the full value cannot be forced into the 70:30 split.
  • Including civil works does not by itself turn a contract into a works contract; the test is whether the end product is immovable.
  • A later change in law cannot be the basis for alleging suppression under Section 74.

Need help with a classification or works contract dispute? See our GST litigation services and GST law resources.